This course is designed for project managers, managers, supervisors, Engineers, or other individuals who are willing to use Microsoft Project 2007 as a part of their project management activities.
Microsoft Project 2007 Advanced
Exam # |
Duration |
Language |
Level |
Type |
Classroom |
Code |
Fees |
-- |
15 |
Arabic/English |
Advanced |
Course |
Classroom |
Cs345 |
0 LE |
Description :
This course is mainly dedicated to study the Microsoft Project 2007 (Advanced Level) which is used to manage various projects.
Objectives :
-
Learn about a lot of advanced topics as for working with tasks and resources
-
Track problems of tasks and resources
-
Use Macro units
-
Work with multiple projects
-
Measure performance through earned value
-
Share project data with other programs
-
Identify prospected problems and how to deal with them
-
Execute practical training regarding the most important skills you have learned during this course
Topics :
Constraints
-
Constraints types
-
Specify Constraint Type
Scheduling Formula
-
What are the components of Scheduling Formula?
-
Tasks Types
-
Assign a Task Type
-
Change Task Default Type
Working with IDs
-
Task ID
-
Task Unique ID
-
WBS Codes
Effort-Driven Scheduling
-
Activating Effort-Driven Scheduling
-
Deactivating Effort-Driven Scheduling
Relationship between Resource and Duration
-
Resource Availability
-
Delaying Assignment of A Resource
Work Contour
-
Methods of Work Contour
-
Select a Work Contour Method
Material Consumption Rate
-
Material Consumption Rate Types
-
Enter Material Consumption Rate
Resource Allocation
-
Resource Allocation Types
-
View Overallocated Resources
Resolve Resource Overallocation
-
Resolve Resource Overallocation manually
-
Resource Leveling
-
Changes Preview
Cost Rate
-
Entering Resource Cost Rates
-
Fixed Cost
Several Cost Rates For the Single Resource
-
Working With Cost Rate Tables
-
Assign Cost Rate
-
Entering Cost Rates for different Durations
Costs
-
Baseline cost
-
Actual cost
-
Project Statistics
Interim Plan
-
Difference between Interim Plan and Baseline
-
Saving Interim Plan
Update Project Data
-
Update Task Complete Percent
-
Rescheduling Uncompleted Tasks
Earned Value Overview
-
Earned Value Definition
-
Earned Value Advantages
Calculating Earned Value
-
How Earned Value is Calculated?
-
View Task Earned Value
-
View Project Earned Value
Earned Value Fields
-
Key Values
-
Calculating Variances
-
Work Completion Costs
-
Performance Index
Master Projects and Sub Projects
-
Consolidating projects
-
Link Tasks among Projects
-
Saving Workspace
Resource Pool Overview
-
Resource Pool Significance
-
Create Resource Pool
-
Edit Resource Pool
-
Break Link between Resource Pool and Sharer File
Saving Project Data in Different Formats
-
Save Project Data as XML
-
Copy Picture of a Project Data
Import /Export Data Between MS Project and Other Applications
OLE Objects
-
Create New Embedded Object
-
Create Linked or Embedded Object from File
-
Create Linked or Embedded Object from Clipboard
Macros
-
Define Macros
-
Record Macros
-
Run Macros
Organizer
-
Organizer Significance
-
How to Deal with Organizer
Send Attachments or Schedule Note
-
Send Project File
-
Send Schedule Note
Routing
-
Route Project to
-
Route the Project to another Supplier
Project Triangle
-
Start to Identify the Problem
-
Solving Time Problems
-
Proposed Solution to Manage Cost Problems
-
Solving Project Scope Problems
-
Quality and Project Triangle
Additional Files
-
Contingency Plan
-
Anticipated Contingencies
-
Lessons to Be Learned from the Project
Recommended Knowledge :
Mastery of MS Project 2007 (Core level).
Recommended Course(s) :
Microsoft Project 2007 Core
Training Materials :
EnterCaps Official Courseware
Labs :
This course includes several labs to ensure you will gain the targeted skills and experience.
Credential :
This course is significant to whom their work requires project management and to whom desiring to develop and improve their business management using the computer to facilitate executing a lot of tasks.
Category :
Project Management